Thursday, October 9, 2008

Tile Selection

Bristile "Slate"
Posted by PicasaThis is the roof tile that we are liking at the moment. This could change in a second though.
Posted by danma at 7:28 PM

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

Colour Selection

  • Laundry - Benchtop - Natural Quartz Squreform edge - Bottom - Mushroom Linea
  • Showerscreens - Frameless Glass
  • Bathroom Vanities - Tops- Caesarstone Osprey - Bottom - Blackened Linewood
  • Glass Splashback - Phantom - DG 3310 Deco Glaze on Clear Glass
  • Kickboard - Brushed Aluminium
  • Kitchen Bench - Caesar Stone - Ice Snow
  • Kitchen Cupboards - Polyurethane Polytec Alabaster - Satin Pencil Edge
  • Timberpost to Verandah - Ironstone
  • Downpipes/ meterbox - Dune
  • Cladding - Colour Match - Dune
  • Eaves/ verandah ceilings - White Smoke
  • Front Door - Taubmans -colour match Ironstone
  • Stencilled Driveway - Random Blue Stone with brick border - Storm Grey
  • Garage door - Contemporary Profile - Dune
  • Gutter - Dune
  • Fascia - Ironstone
  • Roof Tiles - Bristile -Shingle - Classic - Gun Metal
  • Feature Bricks - Austral - Urbane One - Pepper
  • Bricks - Austral - Urbane One - Silver

Stainless Balustrading

  • http://www.balustrading.net.au

Blog Archive

  • ►  2012 (1)
    • ►  January (1)
  • ►  2011 (5)
    • ►  October (2)
    • ►  August (1)
    • ►  June (2)
  • ►  2010 (22)
    • ►  September (6)
    • ►  August (6)
    • ►  July (4)
    • ►  June (3)
    • ►  May (3)
  • ►  2009 (230)
    • ►  December (7)
    • ►  September (2)
    • ►  August (28)
    • ►  July (78)
    • ►  June (52)
    • ►  May (18)
    • ►  April (4)
    • ►  March (12)
    • ►  February (7)
    • ►  January (22)
  • ▼  2008 (47)
    • ►  December (11)
    • ►  November (9)
    • ▼  October (17)
      • We are off to Council......Tomorrow!!!!
      • New Lesson Learnt.
      • Sunday is New Post Day.
      • Contracts will be ready for the weekend....
      • Our Weekly Update....
      • What's been happening....
      • Tile Stain Test
      • Kitchen Photo
      • Wall Colours
      • Colour Selection Done
      • Have a look at this!!!!
      • Sovereign Facade
      • Plan's are ready....
      • Brick Selection
      • Brick Selection
      • Tile Selection
      • Waiting for those plans..... due the 8th October!!...
    • ►  September (10)

Time Line

  • 23/03/09 - Void roof installed
  • 23/03/09 - Bricks Arrive
  • 23/03/09 - Plumbing Completed
  • 20/03/09 - Roof Installed
  • 19/03/09 - 1st Floor Roof Installed
  • 19/03/09 - Windows Installed
  • 19/03/09 - 2nd Story Frame Installed
  • 18/03/09 - Bottom Frame Installed
  • 17/03/09 - Frame Arrives
  • 17/03/09 - Electrical Wiring Done.
  • 16/03/09 - Plumbing Completed
  • 12/03/09 - Slab Poured
  • 06/03/09 - Pods Installed
  • 25/02/09 - Piering Completed
  • 10/02/09 - Excavation Started
  • 29/01/09 - CC Done
  • 28/01/09 - Engineers Drawings Complete
  • 23/01/09 - Sewer Pegout completed
  • 21/01/09 - Peg out complete
  • 20/01/09 - Builders Fence Arrives
  • 19/01/09 - Final Plan Signing
  • 17/01/09 - Tile Selection Completed
  • 16/01/09 - Approved DA picked up.
  • 15/01/09 - DA Approved
  • 26/11/08 - Stop the Clock
  • 19/11/08 - Neighbour notification ends
  • 17/11/08 - Insurance Certificate received
  • 08/11/08 - Air-Conditioning Appointment
  • 05/11/08 - New DA number allocated
  • 31/10/08 - DA sent to Council.
  • 28/10/08 - New cheque issued for 5% deposit
  • 27/10/08 - 5% Deposit Paid - But the bank wouldn't accept it.
  • 25/10/08 - Contracts signed
  • 11/10/08 - Colour selection appt. Colours all done. Thanks "A"
  • 24/09/08 - Paid $2400 for plans to be drawn
  • 20/09/08 - Tender is ready, went out to The Ponds to pick it up.
  • 09/09/08- Paid $600 to new builder for contour survey & tender
  • 08/09/08 - Faxed builder to say we were not signing the variation
  • 14/08/08 - House demolished
  • 23/07/08 - DA approved
  • 16/07/08 - Kitchen appt.
  • 25/06/08 - Colour appt.
  • 02/06/08 - DA received by council
  • 23/04/08 - Contract appt.
  • 07/04/08 - Rescheduled tender appt 3rd try.
  • 27/03/08 - Appt cancelled due to double booking
  • 12/03/08 - Back for 2nd tender, plans scrapped so we start again
  • 07/03/08 - Paid $3200
  • 05/03/08 - 1st Tender appointment
  • 28/01/08 - Paid $800 for contour survey
  • 21/01/08- Picked our dream home
  • 17/11/08 - Insurance Certificate received
  • 26/11/08 - Stop the Clock

My Blog List

  • Gametag
    How many DS games do your kids have? How do you store them?
    11 years ago
  • Building a Wisdom Homes Impression in Sydney
    Sold our Wisdom Impression
    13 years ago
  • Building our life on the links
    Brrr - it's getting cold!
    14 years ago
  • Our Adventure - Building a Wisdom Prosperity 23
    She's ours! we have the keys!
    15 years ago

About Me

danma
Sydney, NSW
Married, Taxi Driver, Chef, Washer Woman,Peace Keeper & Mum to 2 boys
View my complete profile

Disclaimer

  • Disclaimer - This blog is for all our family and friends and anyone else that would like to come along for the ride. Company names have been mentioned for accuracy in our journey.