skip to main
|
skip to sidebar
All About The Build
The Story of Our Journey into the Unknown....
Monday, June 15, 2009
Master Bedroom
Some photo's that I took yesterday, this is the main bedroom it was so cold up there I was wondering if the insulation does anything at all.
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
Colour Selection
Laundry - Benchtop - Natural Quartz Squreform edge - Bottom - Mushroom Linea
Showerscreens - Frameless Glass
Bathroom Vanities - Tops- Caesarstone Osprey - Bottom - Blackened Linewood
Glass Splashback - Phantom - DG 3310 Deco Glaze on Clear Glass
Kickboard - Brushed Aluminium
Kitchen Bench - Caesar Stone - Ice Snow
Kitchen Cupboards - Polyurethane Polytec Alabaster - Satin Pencil Edge
Timberpost to Verandah - Ironstone
Downpipes/ meterbox - Dune
Cladding - Colour Match - Dune
Eaves/ verandah ceilings - White Smoke
Front Door - Taubmans -colour match Ironstone
Stencilled Driveway - Random Blue Stone with brick border - Storm Grey
Garage door - Contemporary Profile - Dune
Gutter - Dune
Fascia - Ironstone
Roof Tiles - Bristile -Shingle - Classic - Gun Metal
Feature Bricks - Austral - Urbane One - Pepper
Bricks - Austral - Urbane One - Silver
Stainless Balustrading
http://www.balustrading.net.au
Blog Archive
►
2012
(1)
►
January
(1)
►
2011
(5)
►
October
(2)
►
August
(1)
►
June
(2)
►
2010
(22)
►
September
(6)
►
August
(6)
►
July
(4)
►
June
(3)
►
May
(3)
▼
2009
(230)
►
December
(7)
►
September
(2)
►
August
(28)
►
July
(78)
▼
June
(52)
Downstairs Powder Room
1st coat on....
Downstairs Powder Room.
New Front Doors Arrive....
Painting Started....
Well That Would be My Kitchen Part 3
Alfresco Area
Bedroom 1 with Cornices...
Garage Door On
Water Tank Arrives
Cornices done in the Bedrooms
Inside the Pantry....
Pantry Doors
My Kitchen ... Part 2
That's my Kitchen....
En-Suite Cupboard....
We have Laundry Cupboards.....
Linen Cupboard Doors.....
Cupboard Under the Stairs
One last one for the night.......
Cookies for the Birthday Boy.....
Cupcakes for The Birthday Boys Class......
We have a staircase.....
And a Close-Up....
Down The Media Room Side....
Laundry Door
Opinions Needed Please
Bedroom Door...
Linen Cupboard Downstairs
Front Doors
Walk In Robe....
Main Bathroom
Master Bedroom
And from the Front
Gutter Guards
Inside the Garage
Media Room
Oh that would be the kitchen.....
Leisure Room
Oh Noooo......
Downstairs Powder Room.....
One of the Kids Bedroom's.....
The Kitchen......
Ok so I don't drink but today we got Plastered.....
Media Room Insulation
Leisure Room Insulation
Down the side.....
Looking from the back
Take a Look.....
Larger Front Cladding.....
Back of the House.....
Scaffolding is down......
►
May
(18)
►
April
(4)
►
March
(12)
►
February
(7)
►
January
(22)
►
2008
(47)
►
December
(11)
►
November
(9)
►
October
(17)
►
September
(10)
Time Line
23/03/09 - Void roof installed
23/03/09 - Bricks Arrive
23/03/09 - Plumbing Completed
20/03/09 - Roof Installed
19/03/09 - 1st Floor Roof Installed
19/03/09 - Windows Installed
19/03/09 - 2nd Story Frame Installed
18/03/09 - Bottom Frame Installed
17/03/09 - Frame Arrives
17/03/09 - Electrical Wiring Done.
16/03/09 - Plumbing Completed
12/03/09 - Slab Poured
06/03/09 - Pods Installed
25/02/09 - Piering Completed
10/02/09 - Excavation Started
29/01/09 - CC Done
28/01/09 - Engineers Drawings Complete
23/01/09 - Sewer Pegout completed
21/01/09 - Peg out complete
20/01/09 - Builders Fence Arrives
19/01/09 - Final Plan Signing
17/01/09 - Tile Selection Completed
16/01/09 - Approved DA picked up.
15/01/09 - DA Approved
26/11/08 - Stop the Clock
19/11/08 - Neighbour notification ends
17/11/08 - Insurance Certificate received
08/11/08 - Air-Conditioning Appointment
05/11/08 - New DA number allocated
31/10/08 - DA sent to Council.
28/10/08 - New cheque issued for 5% deposit
27/10/08 - 5% Deposit Paid - But the bank wouldn't accept it.
25/10/08 - Contracts signed
11/10/08 - Colour selection appt. Colours all done. Thanks "A"
24/09/08 - Paid $2400 for plans to be drawn
20/09/08 - Tender is ready, went out to The Ponds to pick it up.
09/09/08- Paid $600 to new builder for contour survey & tender
08/09/08 - Faxed builder to say we were not signing the variation
14/08/08 - House demolished
23/07/08 - DA approved
16/07/08 - Kitchen appt.
25/06/08 - Colour appt.
02/06/08 - DA received by council
23/04/08 - Contract appt.
07/04/08 - Rescheduled tender appt 3rd try.
27/03/08 - Appt cancelled due to double booking
12/03/08 - Back for 2nd tender, plans scrapped so we start again
07/03/08 - Paid $3200
05/03/08 - 1st Tender appointment
28/01/08 - Paid $800 for contour survey
21/01/08- Picked our dream home
17/11/08 - Insurance Certificate received
26/11/08 - Stop the Clock
My Blog List
Gametag
How many DS games do your kids have? How do you store them?
11 years ago
Building a Wisdom Homes Impression in Sydney
Sold our Wisdom Impression
13 years ago
Building our life on the links
Brrr - it's getting cold!
13 years ago
Our Adventure - Building a Wisdom Prosperity 23
She's ours! we have the keys!
15 years ago
About Me
danma
Sydney, NSW
Married, Taxi Driver, Chef, Washer Woman,Peace Keeper & Mum to 2 boys
View my complete profile
Disclaimer
Disclaimer - This blog is for all our family and friends and anyone else that would like to come along for the ride. Company names have been mentioned for accuracy in our journey.
No comments:
Post a Comment